Battery Limits define the liability boundary between two areas of an industrial complex or plant. Thus, all equipment, instruments, piping, and accessories within a Battery Limit are the responsibility of the contractor, supplier, or property owner.


A proper design of Battery Limits is essential for the execution of an engineering project, impacting operation, maintenance and safety of the various process units. 

BL4.PNG

Goals

  • Realize the scope of supply and scope of work of an unit, equipment or industrial process package.

  • Understand the interconnection between equipment and accessories that are inside and outside the Battery Limit.

  • Familiarization with the representation of Battery Limits in P&IDs.

Index

  1. Introduction

  2. Battery Limit representation in P&IDs 

  3. Typical elements in Battery Limits

  • Practical exercise

Slide example

Slide example.PNG

Total number of slides: 43

Course suitable for:

  • Process Engineers who have not been exposed to the topic, or less experienced

  • Engineers from other technical disciplines that participate in engineering projects

  • Technical personnel from plant and operational environments who want to understand the scope of work of process units

  • Managerial personnel who want to understand technical aspects of the scope of work of process units